铁道工程学报  2006, Vol. 23 Issue (1): 40-43    DOI:
Current Issue | Archive | Adv Search |
APPLICATION OF CURTAIN GROUTING IN THE PILES CONSTRUCTION OF WATERY STRATA
YANG Bo1, YANG Zhuan-yun2, LIAO Wei-yang2
1The sixth Engineering Corporation of China Gezhouba Group; 2The department of bridge and construction engineering, Chongqing Jiaotong University
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech