Abstract Research purposes: The stability of the high-rise pier is always a critical factor for the safe of bridge. How to increase the stability of the high-rise pier, and at the same time make the appearance aesthetic and the force reasonable,is always a question for the engineers explored. The paper analyses the spacial stability for the double-shaft and thin-wall high-rise pier bridge of the Jing-Cheng-San-Qi Qingshuihe 2#, with the three-dimensional finite element analysis software SAP2000,comparisons for the stability of the non-collar beam between the double-shaft of the high-rise pier and the added-collar beams for the longest cantilever construction and the final completion are analyzed.
Research conclusions: The influence of the stability by the collar beam for the double-shaft and thin-wall high-rise pier is preliminarily given; the collar-beam is making a larger contribution to the straight forward stability for the bridge, and has little effect for the lateral stability; increasing the collar-beam between the thin-wall piers , the contribution for the stability comes to the stabilization. The collar-beam between the thin-wall piers is effectively increasing the stability for the double-shaft and thin-wall high-rise pier bridge, but after a certain extent, increasing the numbers of the collar-beam is not apparent.
|
Received: 30 July 2008
|
|
|
|
|
[1]项海帆.高等桥梁结构理论[M].北京:人民交通出版 社,2002.
[2]龙驭球,包世华.结构力学[M].北京:高等教育出版社, 2000.
[3]李国豪.桥梁结构稳定与振动[M].北京:中国铁道出版 社,2002.
[4]北京金土木软件技术有限公司.SAP2000中文版使用指 南[M].北京:人民交通出版社,2006.
[5]李衡山,于大涛,廖朝华.石马河特大桥高墩稳定性分析 [J].中外公路,2006(12):71-73.
[6]刘进.高墩大跨连续刚构桥桥墩稳定性分析[J].铁道 建筑,2006(10):10-12.
|
|
|
|