|
|
Study on Arrangement Scheme of New Baishatuo Six Lines Yangtze River Bridge of Chongqing-Guiyang Railway
|
AI Zong-liang, CHEN Ke-jian, YAN Yong, YUAN Ming, TONG Deng-guo |
China Railway Eryuan Engineering Group Co. Ltd,Chengdu, Sichuan 610031, China) |
|
|
Abstract Abstract:Research purposes: New Baishatuo Six Lines Yangtze River Bridge of Chongqing-Guiyang Railway is controlled by terrain, navigation, flood flowing, environmental protection, bridge site and so on, and the main bridge adopt (81+162+432+162+81) m six lines bridge across Yangtze River. In the world scope, large span bridge of six lines railway has not been constructed yet. Combined with the line conditions and bridge engineering, the arrangement scheme of bridge was studied.
Research conclusions:(1)Based on the factors, such as economy, landscape effect, convenient construction, the site condition and so on, it was recommended to adopt steel truss girder cable-stayed bridge scheme. (2)Based on line conditions, and based on the highway-railway bridge construction investigation at home and abroad, it was confirmed that "up 4 down 2" of six lines railway on two layers is the optimal scheme. (3)Inverted trapezoidal section scheme with 3 main trusses, bracket section scheme with 2 main trusses, inverted trapezoidal section scheme with 2 main trusses, rectangular section scheme with 2 main trusses were compared, and the research results show that rectangular section scheme with 2 main trusses is the optimal solution.(4)The research results can provide a reference for the design of multi line railway bridge or highway-railway bridge.
|
|
|
|
|
[1]陈克坚. 重庆至利川铁路韩家沱长江大桥总体设计[J]. 桥梁建设,2012(6):63-67.
Chen Kejian. Overall Design of Hanjiatuo Changjiang River Bridge on Chongqing-Lichuan Railway[J]. Bridge Construction,2012(6):63-67.
[2]姜天华,李元松,孙杰. 天兴洲大桥南汊主桥主桁断面型式的研究[J]. 武汉化工学院学报,2006(4):54-56.
Jiang Tianhua, Li Yuansong, Sun Jie. Research on Types of the Main Truss of Tianxingzhou Bridge[J]. Journal of Wuhan Institute of Chemical Technology,2006(4):54-56.
[3]冯沛,李凤芹. 济南黄河公铁两用桥主桥结构型式研究[J]. 铁道工程学报,2010(8):67-72.
Feng Pei,Li Fengqin. Study on Structure Type of Main Span of Jinan Yellow River Highway-Railway Combined Bridge[J]. Journal of Railway Engineering Society, 2010(8):67-72.
[4]李卫华,杨光武,徐伟. 黄冈公铁两用长江大桥主跨567 m钢桁梁斜拉桥设计[J]. 桥梁建设,2013(2):10-15.
Li Weihua,Yang Guangwu,Xu Wei. Design of Steel Truss Girder Cable-Stayed Bridge of 567 m Main Span of Huanggang Changjiang River Rail-cum-Road Bridge[J]. Bridge Construction,2013(2):10-15.
[5]周孟波,刘自明,王邦楣. 斜拉桥手册[M]. 北京:人民交通出版社,2004.
Zhou Mengbo, Liu Ziming, Wang Bangmei. Cable-stayed Bridge Handbook[M].Beijing:China Communications Press,2004.
[6]黄纳新. 金海特大公铁两用斜拉桥桥式方案研究[J]. 铁道勘察,2013(1):95-98.
Huang Naxin. The Scheme Research of Jinghai Super Large Highway-Railway Cable-Stayed Bridge[J]. Railway Investigation and Surveying, 2013(1):95-98 |
|
|
|