[5] 中铁二院工程集团有限责任公司,等.遂渝线无砟轨道试验段路基工程关键技术研究——无砟轨道路基与桥隧涵构筑物刚度匹配技术试验研究[R].成都:中铁二院工程集团有限责任公司等,2009.
China Railway Eryuan Engineering Group Co,Ltd,Etc. Research On Key Technology of Subgrade EngineeriIIg Ballastless Track Pilot Section of Chongqing—Suining Railway--Experimental Study Oil Stiffness Matching Technology for Ballastless Subgrade with Bridge,Tunnel and Culvert Structures[R].Chengdu:China Railway Eryuan Engineering Group Co,Ltd, 2009.
[6] 魏永幸,邱延峻.高速铁路无砟轨道路基面支承刚度研究[J].铁道工程学报,2010(7):39—44.
Wei Yongxing,Qiu Yanjnn. Bracing Stiffness of Subgrade Surface for Ballastless Track of High—Speed Railway[J].Journal of Railway Engineering Society,2010(7):39—44.
[7]蔡成标,徐鹏.高速铁路无砟轨道关键设计参数动力学研究[J].西南交通大学学报,2010(4):493—497.
Cai Chengbiao,Xu Peng.Dynamics Research on Parameters for Key Design of HigIl—speed Railway Ballastiess Track[J].Journal of Southwest Jiaotong University,2010(4):493—497.
[8]刘洋,赖紫辉.武广铁路客运专线无砟轨道路基工程接口设计[J].铁道标准设计,2010(1):192—195.
Liu Yang,Lal Zihui.Interface Design of Subgrade Engineering of Wuhan—Guangzhou Passenger Dedicated Railway Ballastless Track[J].Journal of Railway Standard Design,2010(1):192—195