[1] 丁烈云,李炜明,吴贤国,等.武汉地铁循礼门车站深基 坑施工监测分析[J].铁道工程学报, 2010(9): 74 -77.
D ing L ieyun, L i Weiming, Wu Xianguo, eta.l Construction Field Monitoring on Deep Excavation of Wuhan Metro Xunlimen Station [ J ]. Journal of Railway Engineering Society, 2010(9): 74 -77.
[2] 姜忻良,宗金辉,孙良涛.天津某深基坑工程施工监测及 数值模拟分析[J].土木工程学报, 2007(2): 79 -103.
Jiang Xinliang, Zong Jinhui Sun Liangtao. Construction Monitoring and Numerical Simulation for a Deep Excavation in Tianjin [ J ]. China Civil Engineering Journal 2007(2): 79 -103.
[3] 覃卫民,逄铁铮,王浩,等.深基坑附近房屋出现裂缝的 施工监测分析[J].岩石力学与工程学报, 2009(3): 533 - 540.
Qin Weimin, Pang Tiezheng, W ang Hao, eta.l Analysis of Excavation Monitoring for House Cracking Nearby Deep Pit Foundation [J]. Chinese Journal of Rock Mechanics and Engineering, 2009(3): 533 -540.
[4] 陈福全,汪金卫,刘毓氚.基坑开挖时邻近桩基性状的数 值分析[J].岩土力学, 2008(7): 1971 -1976.
Chen Fuquan, Wang Jinwei Liu Yuchuan. Numerical Analysis of Pile Response Due to Braced Excavation - induced Soil Lateral Movem ent [J ]. Rock and Soil Mechanics, 2008(7): 1971 -1976.
[5] 王显星,包旭范,高强.上海铁路南站大型基坑工程施工 对周边环境影响[J].岩石力学与工程学报, 2005(增 2): 5454 -5458.
W ang Xianxing, Bao Xufan, Gao Qiang. Influence of Large Foundation Pit Construction Caused by Shanghai South Railway Station on Environment in Shanghai [ J ]. Chinese Journal of Rock Mechanics and Engineering, 2005(S2): 5454 -5458.
[6] 戚科骏,王旭东,蒋刚,等.临近地铁隧道的深基坑开挖 分析[J].岩石力学与工程学报, 2005(增2): 5485 - 5489.
Qi Kejun, Wang Xudong, Jiang Gang, eta.l Analysis of Deep pit Excavation Adjacent to Tunnel [ J ]. Chinese Journal of Rock Mechanics and Engineering, 2005(S2): 5485 -5489.
[7] 聂宗泉,张尚根,孟少平.软土深基坑开挖地表沉降评估 方法研究[J].岩土工程学报, 2008(8): 1218 -1223.
Nie Zongquan, Zhang Shanggen, Meng Shaoping. Surface Settlement of Deep Foundation Pits by Excavation [ J ]. Chinese Journal of Geotechnical Engineering, 2008(8): 1218 -1223.
[8] 高广运,高盟,杨成斌,等.基坑施工对运营地铁隧道的 变形影响及控制研究[J].岩土工程学报, 2010(3):453 - 459.
Gao Guangyun, Gao Meng, Yang Chengbin, eta.l Influence of Deep Excavation on Deformation of Operating Metro Tunnels and Counterm easures [J ]. Chinese Journal of Geotechnical Engineering, 2010(3): 453 -459.
[9] 杨敏,周洪波,杨桦.基坑开挖与临近桩基相互作用分析 [J].土木工程学报, 2005(4): 91 -96.
Yang Min, Zhou Hongbo, Yang Hua. Numerical Analysis of Pile Response Due to Unsupported Excavation - induced Lateral Soil Movem ent [ J ]. China CivilEngineering Journa,l 2005(4): 91 -96.
[10] TB 10002. 5-2005,铁路桥涵地基和基础设计规范[S].
TB 10002. 5-2005, Code for Design on Subsoil and Foundation or Railway Bridge and Culvert [S].
[11] GB 50157-2003,地铁设计规范[S].
GB 50157-2003,Code for Design of Metro [S].
[12] TB 10002. 1-2005,铁路桥涵设计基本规范[S].
TB 10002. 1-2005, Funda mental Code for Design on Railway Bridge and Culvert [S].
[13] GB 5029-1999,地下铁道工程施工及验收规范[S].
GB 5029-1999, Code for Construction and Acceptance Of Metro Engineering [S].
|