铁道工程学报  2010, Vol. 27 Issue (10): 26-29    DOI:
Current Issue | Archive | Adv Search |
Application of Improved Layed Summation Method in Calculation of Railway Foundation Settlement
YAN Dong
China Railway Siyuan Survey and Design Group Co.Ltd.,Wuhan,Hubei 430063,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech