|
|
Research on Traffic Organization of Existing Railway Lines under the Condition of PDL Network |
SHI Tie1, GUAN Xiao-pin2 |
1. Southwest Jiaotong University, Chengdu, Sichuan 610031, China; 2. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes:The Passenger dedicated line (PDL) mainly undertakes the passenger traffic to realize separating the passenger traffic and freight traffic into different railway lines and relieve the situation of the insufficient transport capacity of the existing railway line, so it is necessary to adjust the traffic organization mode of the existing line to adapt to this change trend. This paper discusses the orientation of the passenger and freight traffic products of the existing line.
Research conclusions:After the passenger dedicated line network is formed, the passenger traffic service of the existing lines will reduced much, and plenty of passenger stations and mixed passenger and freight service stations will be changed into freight stations. In that case, the freight traffic capacity of the existing line will enhance, the train type on the line will reduce, the speed difference between trains will lower, the travel speed of train will enhance, and the coefficient of removal for scheduling one passenger train will reduce, so based on this situation, the existing line should explore its traffic capacity to meet the increasing traffic demand. At the same time, the existing line should well coordinate the relation between it and the passenger dedicated line, adjust its traffic organization principle, upgrade its infrastructure, pay more attention to the quality of freight traffic, grasp the development chance, full give play to its advantages, accurately aim at the market target, and develop its characteristic passenger and freight traffic products to enhance its competition capacity for meeting the increasing traffic demand.
|
Received: 27 April 2010
|
|
|
|
|
[ 1 ] 王进勇, 闫海峰, 任其亮. 客运专线与既有线运输组织协调的探讨[J]. 铁道运输与经济, 2009(5): 27-30.
Wang Jinyong, Yan Haifeng, Ren Qiliang. Discussion on Coordination of Transport Organization of PDL and Existing Lines [J]. Railway Transport and Economy, 2009(5): 27-30.
[ 2 ] 王莹, 彭其渊, 李海波. 客运专线建设对既有线的影响分析[J]. 铁道运输与经济, 2009(1): 26-28.
Wang Ying, Peng Qiyan, Li Haibo. Impact of Passenger-dedicated Lines' Construction on Existing Lines[J]. Railway Transport and Economy, 2009(1): 26-28.
[ 3 ] 孙健. 客货分线后既有线运输组织研究[J]. 铁道运输与经济, 2009(1): 43-44.
Sun Jian. Research on Transport Organization of Existing Line after Separating Passenger Transport and Freight Transport into Different Line[J]. Railway Transport and Economy, 2009(1): 43-44.
[ 4 ] 时颢, 朴爱华. 既有线上提高列车运行速度对运输能力的影响[J]. 中国铁路, 1996(5): 9-11.
Shi Hao, Bu Aihua. Influence of Transport Capacity by Increasing Train Speed on Existing Railway Line[J]. China Railway, 1996(5): 9-11.
[ 5 ] 赵跃, 韩宝明. 繁忙干线提速条件下客货分运的研究[J]. 北方交通大学学报, 1999(12): 103-108.
Zhao Yue, Han Baoming. Major Trends in Rail Trunk Lines in China: The Case for Dedicated Fast Passenger Services[J]. Journal of Northern Jiaotong University, 1999(12): 103-108.
[ 6 ] 严余松, 蒋葛夫. 既有双线旅客列车提速对通过能力的影响分析[J]. 系统工程, 1998(9): 50-55.
Yan Yusong, Jiang Gefu. Analysis of Influence Factors of the Passenger Train Existing Double Lines[J]. System Engineering, 1998(9): 50-55.
[ 7 ] 崔逢霞. 既有线提速与通过能力的关系[J]. 交通科技与经济, 2009(4): 27-31.
Cui Fengxia. Analyze the Changing of the Line Carrying Capacity on Existing Double Railway Lines[J]. Technology & Economy in Areas of Communications, 2009(4): 27-31.
[ 8 ] 胡思继. 列车运行图编制理论[M]. 北京: 中国铁道出版社, 2007.
Hu Siji. Theory of Train Graph Compilation[M]. Beijing: China Railway Publishing House, 2007: 118-153.
|
|
|
|