Research on the Choice of Reserved URT Form for BRT NO. 1 Line Inside Island in Xiamen to Be Upgraded |
ZHANG Qing-feng |
China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes:The Line 1 of Bus Rapid Transit (BRT) in Xiamen is the Chinese first BRT reserving the technical conditions to be upgraded to Urban Rail Transit (URT) in aspect of civil engineering. This paper systematically introduces the research process and scheme on choosing the reserved URT of running train of linear motion actuator for BRT No.1 Line in Xiamen to be upgraded for the purpose of providing the reference to design of BRT reserved the condition to be upgraded to URT in other cities.
Research conclusions:From the research on choosing the reserved URT of running train of linear motion actuator for BRT No.1 Line in Xiamen to be upgraded, it is concluded whether BRT will be upgraded to URT or not, or upgraded to how much traffic volume of URT depending on the predicted forecast passenger flow and the traffic capacities of BRT and URT. In addition, what form of URT adopted, such as underground form, ground form and elevated form, should be determined according to the traffic organization, geological conditions, site conditions, demolition factors, project time requirements, landscape, investment and other factors. Finally, based on the comprehensive considering the various technical indexes of all forms of URT and project construction conditions, the proper reserved URT form should be chosen.
|
Received: 15 December 2009
|
|
|
|
|
[ 1 ] 王玉泽, 等. 快速公交系统(BRT)规划设计指南[M]. 北京:人民交通出版社, 2010.
Wang Yuze, et al. The Guide to Bus Rapid Transit System(BRT) Planning and Design[M]. Beijing: China Communications Press, 2010.
[ 2 ] 黄静, 等. 厦门市快速公交系统(BRT)一期工程总体设计[Z]. 武汉:中铁第四勘察设计院集团有限公司, 2007.
Huang Jing, et al. The General Design for Xiamen’s Bus Rapid Transit(BRT) phase I project[Z]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2007.
[ 3 ] 黄静, 等. 厦门市快速公交系统(BRT)一号线岛内段及联络线初步设计[Z]. 武汉:中铁第四勘察设计院集团有限公司, 2007.
Huang Jing , et al. The Primary Design for the In side Xiamen Island Section of the Xiamen’s Bus Rapid Transit(BRT) No.1 Line and the Tie Line[Z]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2007.
[ 4 ] 黄静, 等. 厦门市快速公交系统(BRT)一号线岛内段及联络线施工图设计 [Z]. 武汉:中铁第四勘察设计院集团有限公司, 2007.
Huang Jing, et al. The Construction Drawing Design for the Inside Xiamen Island Section of the Xiamen’s Bus Rapid Transit(BRT) No.1 Line and the Tie Line[Z]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd, 2007.
[ 5 ] 丁明, 等. 厦门市快速公交(BRT) 5条线路客流预测[R]. 厦门:厦门市城市规划设计研究院, 2008.
Ding Ming, et al. The Passenger Traffic Forecast of Xiamen’s Bus Rapid Transit (BRT) 5 Lines[R]. Xiamen: Xiamen Urban Planning & Design Inistute, 2008.
[ 6 ] 建标104-2008,城市轨道交通工程项目建设标准[S].
MO HURD Standard 104-2008, Standard for Urban Rail Transit Engineering Projects[S].
[ 7 ] 金羊网. 厦门BRT掠影[ EB/OL ]. 神奇的天路(组图), (2009-07-09) [ 2009-09-08 ]. http://city. Finance. sina. com. cn/city/2009-07-09/113681. html.
Golden Sheep Net . A Glance of Xiamen’s BRT [ EB/OL ]. A Miraculous Road to Heaven( a group of photos), ( 2009-07-09) [ 2009-09-08 ]. http://city. finance. sina. com. cn /city /2009-07-09/113681. html.
[ 8 ] 厦门市思明区旅游园林局. BRT成厦门旅游新亮点 [ EB/OL ]. ( 2008-10- 21 ) [ 2009-09-08 ]. http://www. cnta. gov. cn /html/2008-10 /2008-10 -21-11-40-13275. html.
Xiamen Siming District Travel and Landscape Board. BRT is the New Travel Shining Point[ EB/OL ]. ( 2008-10-21) [ 2009-09-08]. http://www. cnta. gov. cn /html/2008-10/2008-10-21-11-40-13275. html.
[ 9 ] 广州市地下铁道设计研究院. 直线电机轨道交通设计规范(征求意见稿) [ S/OL ]. 国家工程建设标准信息化网(2008-11-4) [ 2009-09-08 ]. http://www. ccsn. gov. cn /Norm/Levy Comment/ show. aspx? guid=228c807e-2609-45ae- a15e-d4f33db8b411
Design Inistute of Guangzhou Metro Coporation. Railtransit by liner motor design construction( Opinion Soliciting Draft ) [ S /OL ]. National Engineering Construction Standards Information Network( 2008-11-4) [ 2009-09-08]. http: //www. ccsn. gov. cn /Norm /Levy Comment/ show. a spx? guid=228c807e- 2609-45ae-a15e-d4f33db8b411( in Chinese)
[ 10 ] 卢桂英, 薛波, 牛淑霞. 北京机场线直线电机车辆基地设计创新与应用 [J]. 铁道工程学报, 2008 (11): 77- 81.
Lu Guiying, Xue Bo, Niu Shuxia. Design Innovation and Application of Liner Motor Vehicles Depot in Airpot Express of Beijing[J]. Journal of Railway Engineering Society, 2008(11): 77-81. ( in Chinese)
[ 11 ] 朱竞若, 蒋升阳. 在城市繁忙路段建设全封闭快速公交系统—厦门“空中走廊”让公交飞驰[N]. 人民日报, 2009-3-25(1).
Zhu Jingruo, Jiang Shengyang. Build Bus Rapid Transit System Overall Closed in the Busy Section of City-Xiamen’s "Sky Subway" Allows Buses to Run Like Flying[N]. China Daily, 2009-3-25(1).
[ 12 ] 王慕慈. 海线捷运[ EB/OL ]. 无缝计划上路( 2009-06-10 ) [ 2009-09-08 ]. http://www. cdns. com. tw /20090611 /news/dfzh /710010002009061014433570. html.
Wang Muci. Hai line URT will be Carried Out in a Seam less Plan[ EB/OL ]. ( 2009-06-10) [ 2009-09-08]. http://www. cdns. com. tw /20090611 /news/dfzh/710010002009061014433570. html.
|
|
|
|