Analysis of the Surface Subsidence during the Excavating of Large-span Subway Station under Shallow Cover |
YANG Hui-jun1, KONG Heng2 |
1. China Railway Sixth Group Co. Ltd, Beijing 100036, China; 2. Beijing Municipal Construction Co. Ltd, Beijing 100045, China |
|
|
Abstract Abstract:Research purposes: During the excavating of large-span subway station with shallow cover, the phenomenons such as repeated disturbance, complex mechanical conversion easily occur, which bring excessive surface subsidence. In the paper, the construction of tunnel arch excavation and support with shallow cover is introduced mainly, the analysis of deformation law, and influences of construction sequence are made on basis of monitoring and measurement for the surface subsidence.
Research conclusions:The research conclusions show: (1) The average value of surface subsidence is up to -36.31 mm, the limit of the surface settlement should be modified in order to decrease both negative effect on the surrounding environment and construction cost. (2) The ground surface settlement trough due to the construction is at the center of subway station, the distance between flex point and the center of subway station is about 18 m, meanwhile, the surface subsidence over 20 m from the center of subway station decreases rapidly, the distribution of the surface subsidence is 25~30 m from both sides of the subway station. (3) The surface subsidence due to construction of the subway station mainly occurs in a small pilot tunnel excavation supporting and buckle arch construction stage, 48.47% and 93.03% of the total settlement, especially during the course of a small pilot tunnel excavation supporting, which is close to half of the total settlement. (4)The result can provide the reference for design and construction of the similar engineering.
|
|
|
|
|
[1]王梦恕. 地下工程浅埋暗挖技术通论[M]. 合肥:安徽教育出版社,2005.
Wang Mengshu. Construction Method of Undercutting under Shallow Overburden for Underground Works[M]. Hefei: Anhui Education Press,2005.
2]王梦恕,洪开荣,干昆荣,等. 中国隧道及地下工程修建技术[M]. 北京:人民交通出版社,2010.
Wang Mengshu, Hong Kairong, Gan Kunrong,etc. Tunnelling and Underground Engineering Technology in China[M]. Beijing:China Communications Press,2010.
[3]杨会军,刁天祥,王志刚,等. 大跨浅埋暗挖地铁车站超近距下穿运营地铁车站施工技术研究报告[R]. 洛阳:中铁隧道集团有限公司,2008.
Yang Huijun, Diao Tianxiang, Wang Zhigang,etc. The Construction Technology Research of Large-span Underground Excavation under Shallow Cover Method Building Metro Station under the Running Metro Station with Extremely Near Distance[R]. Luoyang:China Railway Tunnel Group,2008.
[4]杨会军. 浅埋暗挖大跨隧道施工环境影响分析[J].铁道工程学报,2010(5):43-47.
Yang Huijun. Analysis of Construction of Shallow Large-span Tunnels on Environment with Surface Excavation Method[J]. Journal of Railway Engineering Society,2010(5):43-47. |
|
|
|