ANALYSIS OF THE LINING SAFETY OF WUSHAOLING TUNNEL IN F7 FAULT |
FAN Heng-xiu,LI Chang-ning |
The First Engineering Bureau Group of China Railway |
|
|
Abstract This displacement of the rock wall is not convergence in a long time after excavating in F7 fault of the Wushaoling tunnel, and the time for lining executed can not meet the request of "The Code for Design of Railway Tunnel" , because the rock is weak and soft with complicated and high earth pressure. This paper indicates that the designing parameters are feasible and safe through analyzing the safety of lining by using FEM and surveying, the second lining should be carried out in time in order to control big displacement.
|
Received: 20 August 2004
|
|
|
|
|
[1]冯卫星,吴康保.铁路隧道设计[M].成都:西南交通大学出 版社,1998.
[2]吴鸿庆,任侠.结构有限元分析[M].北京:中国铁道出版 社,2000.
[3]潘昌实.隧道力学数值方法[M].北京:中国铁道出版社, 1995.
[4]任重.ANSYS实用分析教程[M].北京:北京大学出版社, 2003.
|
|
|
|