Research on the Exam ination and Evaluation Method and Standard for Grouting Effect to the High-pressure and Rich-water Fault
ZHANG M in-qing1, Sun Guo-qing2
1. Yichang -Wanzhou Railway Construction Headquarter, Ministry of Railways, Ensh,i Hubei 445000, China;2. Scientific Research Institute, China Railway TunnelGroup Co., Ltd, Luoyang, Henan 471009, China
Abstract Research purposes: The research is done on the examination and evaluation method and standard for the grouting effectunderhigh -pressure and rich -waterweak geological condition to provide the reference toworking out the criterion and standard for the similarengineering.
Research conclusions:The P -Q -tcurve analysismethod, the analysismethod for the yieldingwaterquantity from the bore, the grouting quantity analysismethod, the determination ofyieldingwaterquantity from the check -up bore, and the check -up bore stability analysismustbe used forexamining and evaluating the grouting effect to the high –pressure and rich -water faul.t The analysis method for the yielding water quantity from the bore and the determination of yieldingwaterquantity from the check -up bore are used forexamining the ponding effec.t The P -Q -tcurve analysis method, the grouting quantity analysis method and the check -up bore stability analysis are used for examining reinforcing effec.t The on -site tests and several grouting cycle tests forF11 high -pressure and rich -water fault of Qiyueshan Tunnel show the standard of2 litres perminute /permeter for the yieldingwater from the check -up bore is feasible and reliable.
ZHANG M in-qing,Sun Guo-qing. Research on the Exam ination and Evaluation Method and Standard for Grouting Effect to the High-pressure and Rich-water Fault[J]. 铁道工程学报, 2009, 26(11): 50-55.