Research on the Selection of Parameters for the Overhead Contact Line System with Stitch Wire on High-speed Railway |
LI Wen—hao1,CUI Xiao—yu1,CHEN Wei—rong2,THOMAS Reichmann3 |
1.The Third Railway Survey&Design Institute Group Corporation,Tianjin 30025 1;2.Southwest Jiaotong University,Chengdu,Sichuan 610031,China;3.Tranportation Systems,Siemens AG,D-91052,Edangen,Germany |
|
|
Abstract Research purposes: In order to study the influences of the parameters for overhead contact line system with stitch wire of high—speed railway on the dynamic performances of the pantograph/overhead contact line system,a 3 D catenary model and a mass—damper—spring pantograph model were adopted to calculate and analyze the overhead contact line with stitch wire and pantograph system of 350 km/h railway.Considering the contact forces and safety。The comparisons were made for the simulation results to select the suitable parameters for the overhead contact line system of high~speed railway.
Research conclusions: The research shows that the Cu—Mg alloy contact wire with the 1 20 mm2 cross—section should be used in priority and its tensile force should never be less than 27 kN.The copper alloy with the 120 mm2 cross—section should be used for the messenger wire and its tensile force should be around 23 kN.The span length should be between 55 m and 60 m.The system height can be 1.4 m to 1.6 m.The tensile force of stitch wire should be less than 3.5 kN.The length of stitch wire varies from 1 6 m to 1 8 m.The distance between the suspension point and the 1 st dropper should be around 4.5 m.There should be no gradient on the contact wire.The catenary irregularity of the wave length equal to 2~6 times of dropper spacing should not appear as much as possible.
|
Received: 22 June 2009
|
|
|
|
|
[1] Reichmann Thomas.Simulation des Systems Oberleitung. skettenwerk undstromabnehmermitderFinite -Elemente - Methode[J], Elektrische Bahnen, 2005, 103 (1): 69 - 75.
[2] 陈维荣,李文豪,张倩,等.几种高速受电弓/接触网系统 动态性能的比较[J].西南交通大学学报, 2009, 44 (3): 01 -06.
[3] European Committee for Electro technical Standardization. EN50367, Railway applications -current collection systems -technical criteria for the interaction between pantograph and overhead contact line[S]. Brussels: CENELEC Central Secretaria,t 2006.
[4 ] European Committee for Electro technical Standardization. EN50119, Railway applications-fixed installation -electric traction overhead contact line [S ]. Brussels: CENELEC Central Secretaria.t 2001.
[5] Internationaler Eisenbahnverband. UIC794, Zusammen- wirken Stromabnehmer/Oberleitung im europaischen Hoch- geschwindigkeitsnetz[S]. Paris: Internationaler Eisenbahn- verband. 1996.
[6] KieBling Friedrich, Puschmann Rainer, Schmieder Axe.l Contact lines for electrical railways: planning -design -im- plementation[M ]. Munich, Erlangen: Publicis Corporate Publishing, 2002.
[7] ZhangWeihua, Mei Guiming, Wu Xuejie, et a.l Hybrid simulation ofDynamics for the pantograph -catenary system [J], Vehicle System Dynamics, 2002, 38(6): 393 -414.
[8] 赵印军.京沪高速接触网悬挂类型的选择分析[J].铁 道工程学报, 2003(2): 100 -103.
[9] 李文豪.高速铁路受电弓/接触网相互作用评价[D ].成 都:西南交通大学, 2007.
[10]保立波,罗健.客运专线弓网关系评价及其在京津城际 铁路中的应用[J].铁道工程学报, 2009(4): 43 -46.
|
|
|
|