|
TB 10621-2009,Code for Design of High Speed Railway[S].
|
|
Zhou Haibin, Li Zhihua. Research on Comprehensive Geophysical Exploration for Hidden Danger to Subgrade of Passenger Dedicated Line[J].Journal of Railway Engineering Society , 2013 ( 4 ):46-50.
|
[ 4 ] |
TB 10621-2009,高速铁路设计规范(试行)[S]
|
[10] |
陈登玉,李涛,邹彦武.高铁路基变形整治施工技术 [J].铁道建筑技术,2013(7):91-94 , 106
|
[6] |
Luo, Z.,Ku, C. S.,Bu, L. Probabilistic Model for Long-Term Deformation of Subgrade Bed Soil in Upgrading-Speed Railway Lines[J].International Journal of Pavement Research and Technology, 2011 (1):34-40.
|
|
Chen Dengyu, Li Tao, Zou Yan. Construction Technology on Base Deformation Remediation of Wuhan-Guangzhou High-speed Railway[J].Railway Construction Technology , 2013 ( 7 ):91-94,106.
|
|
Yao Yuchun, Wei Yongxing, Yuan Biyu. Exploration on the Deformation and Control of Embankment Constructed on Slope Foundation for High-speed Railway [ J].Journal of Railway Engineering Society, 2014(5):16-21.
|
|
JGJ 79-2012 , Technical Code for Ground Treatment of Buildings[S].
|
|
Qi Qinghai. Treating Techniques for The Diseases and Damages of The Seating of the Plate-Type CRTS B Ballastless Track in the Alignment Joint-Test Phase [J].Traffic Engineering and Technology for National Defence , 2013 ( 4 ):41-43.
|
|
Gong Quanmei, Luo Zhe, Yuan Jianyi. Experimental Study on Long-term Cumulative Settlement and Equivalent Cyclic Load of Speed-up Railway Subgrade Soil[J].Journal of the China Railway Society, 2009 (2):88-93.
|
[ 5 ] |
JGJ 79-2012,建筑地基处理技术规范[S]
|
|
Li Guohe, Xu Zailiang, Sun Shuli, etc. The Influence of Surface Subsidence on Construction of High-speed Railway in North China Plain and Its Countermeasures [J].Journal of Railway Engineering Society , 2007 ( 8 ): 7-12.
|
|
Dong Juhong, Zhao Zhigang. Analysis of the Strengthening Design and for Fill Embankment Disease of High-speed Railway[J].Journal of Railway Science and Engineering , 2013 ( 4):66-73.
|
[2] |
姚裕春,魏永幸,袁碧玉.高速铁路斜坡路堤变形控制 探讨[J].铁道工程学报,2014(5):16-21
|
[8] |
齐庆海.联调联试阶段CRTS-B型板式无作轨道底座 病害处理技术[J].国防交通工程与技术,2013 ( 4 ) ; 41-43
|
[3] |
宫全美,罗品,袁建议.提速铁路基床长期累积沉降及 等效循环荷载试验研究[J].铁道学报,2009(2);88- 93
|
[9] |
董炬洪,赵志刚.高速铁路无作轨道填方路堤病害加固 设计与效果分析[J].铁道科学与工程学报,2013(4): 66-73
|
[1] |
周海滨,李志华.客运专线路基隐患的综合物探研究 [J].铁道工程学报,2013(4);46-50
|
[7] |
李国和,许再良,孙树礼,等.华北平原地面沉降对高速 铁路的影响及其对策[J].铁道工程学报,2007 ( 8 ) ; 7-12
|