|
|
NEW CONSTRUCTION TECHNIQUE FOR OVER -HEAD CON- TACT LINE ON QINHUANGDAO-SHENYANG PASSENGER DED- ICATED RAILWAY LINE |
YU Jun,LU Hai-yang,ZHANG Hua |
The Third Engineering Co. Ltd. of Electrification Bureau Group Co. of Chinese Railway |
|
|
Abstract This paper gives an introduction to those of main process flow, new technique, new workmanship, new construction machinery and instruments, allowable error of construction and test technology adopted in construction of over- head contact line on Chinese first passenger dedicated line of electrification railway with speed up to 200-300 km/h, for reference to the similar construction.
|
Received: 25 March 2004
|
|
|
|
|
[2] |
电气化工程局电勘测设计研究院《高速铁路牵引供电技术研究》[M].北京:中国铁道出版社,1995
|
[1] |
德国铁路规范DS997.01《接触网设施的设计、施工和维修》[J].
|
|
|
|