铁道工程学报  2004, Vol. 21 Issue (2): 21-25    DOI:
Current Issue | Archive | Adv Search |
CONSTRUCTION TECHNIQUE FOR SINGLE OVERLAPPED TUNNEL WITH DUAL LAYERS IN CITY PROPER OF SHENGZHEN SUBWAY
PAN Ming-liang
The Third Engineering Division of Chinese Railway Tunnel Engineering Group Co.
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech