|
|
MEASURES FOR STARTING WATER COOLED ENGINE OF CONSTRUCTION MACHINE UNDER LOW TEMPERATURE IN PLATEAU |
LI Shu-de |
Technical Development of the Fifth Engineering Bureau of Chinese Railway |
|
|
Abstract The different measures for starting water-cooled engine of construction machine under low temperature arc analyzed based on analysis of its starting procedure in plateau. The suitable measures for starting water cooled engine of construction machine under low temperature, during the construction of Qinghai-Tibet Railway in cold weather arc defined through taking different measures for construction machine.
|
Received: 04 June 2003
|
|
|
|
|
[1]柴油机(原理、构造、使用、维修)[M].煤炭工业出版社.
[2]冯辉生.工程机械高原环境适应性研究及评价技术[M ]. |
|
|
|