铁道工程学报  2003, Vol. 20 Issue (4): 86-89    DOI:
Current Issue | Archive | Adv Search |
CONSTRUCTION TECHNIQUE RESEARCH OF CAST-IN-PLACE CONCRETING AND LOWERING BEAM TO THE POSITION OF THE WHOLE-SPAN BOX BEAM FOR QINSHEN SPECIAL RAILWAY LINE FOR PASSENGER TRANSPORTATION
LI Jun
The Third Engineering Group Co., Ltd. of China Railway
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech