|
|
THE DIFFICULTY AND SOLUTION OF BRIDGE ERECTION IN SMALL RADIUS CURVE ZONE |
SHU Wen-chao, WU Yu-xing, JING Qi-shou |
Shanghai Railway Construction (Group) Co., Ltd. |
|
|
Abstract On the basis of relationship among the minimal extending length, small radius and the length of back beam, the difficulty of bridge erection is solved by turning track and offset in advance.
|
Received: 16 January 2003
|
|
|
|
|
[1]TB102313-99[S].中华人民共和国行业标准.铁路架桥机架梁规程.
[2]铁路架桥机架梁手册[S].铁道部第三工程局主编. |
|
|
|