铁道工程学报  2003, Vol. 20 Issue (3): 67-70    DOI:
Current Issue | Archive | Adv Search |
CONSTRUCTION TECHNIQUE FOR UNFAVOURABLE SECTION ON MOSHAXI TUNNEL OPENING GEOLOGICAL
ZHUO Guo-ping
The Fourth Engineering Bureau Group Corporation
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech