铁道工程学报  2003, Vol. 20 Issue (2): 56-58    DOI:
Current Issue | Archive | Adv Search |
GEOLOGIC PROBLEMS DURING CONSTRUCTION OF BRIDGE ALONG BANKS OF CHUMAR RIVER
LIU Li-zhi, LIU Ling
China Railways Northwest Scientific Research Institute
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech