EXPLORATION ON ALLOCATION OF CONSTRUCTION MACHINERY FOR DRILLING AND BLASTING OPERATION OF RAILWAY EXTRA-LONG SINGLE-TRACKED TUNNELS |
LIU Yuan-zhong1, FANG Jun-bo2 |
1Beijing Headquarters, China Railway Tunnel Engineering Bureau Group Co.; 2Science-Technology Research Institute, China Railway Tunnel Engineering Bureau Group Co. |
|
|
Abstract Yuanliangshan Tunnel is the longest single-tracked tunnel during construction of Yu-Huai Railway. The allocation of its construction machinery is introduced in this paper. It is expounded that by adopting the traditional construction methods (such as full face tunnelling method or lower guide-adit method) and allocating national-made machinery may obtain also stable and high-efficient rapid tunnelling speed for construction of railway extra-long single-tracked tunnels. Therefore, the good allocation of construction machinery is the key for guarantee rapid tunnelling of extra-long tunnels. At the same time, several suggestions are proposed for allocation of construction machinery for extra-long single-tracked tunnels in China in the future.
|
Received: 21 October 2002
|
|
|
|
|
[1]林志清,等.达万铁路山湾隧道均衡施工技术[A].见:第10届隧道和地下工程科技动态报告文集[C]. 成都:西南交通大学出版社,2000-06.
[2]刘元重.寺铺尖隧道施工技术浅谈[J].隧道建设,1997,(3).
[3]曹红彬.大竹林隧道进口端快速施工技术[J].西部探矿工程,2000,(4).
|
|
|
|