铁道工程学报  2003, Vol. 20 Issue (1): 136-140    DOI:
Current Issue | Archive | Adv Search |
CONTROLLING CONCRETE TEMPERATURE IN PERENNIAL FROZEN EARTH AREA DURING CONSTRUCTING QING-ZANG RAILWAY
CHEN Peng, YU Mu-xian
Qing-Zang Railway Project Headquarters of the 18th Bureau Group Ltd of China Railway
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech