STUDY OF VENTILATION SYSTEM DURING THE CONSTRUCTION WITH COMPLICATED TUNNEL AND GREAT VARIETY FACE DRILLING AND BLASTING METHOD |
YANG Heng-ping, GUO Xiao-song,ZHANG An,ZHANG Bao-sheng |
Xi'an Research Institate of High &New Technology |
|
|
Abstract For solving the difficult problems of the ventilation of complicated tunnel and great variety face drilling and blasting method,a combined ventilation system is designed,based on the developing on the low pressure,great flow capacity and saving-power fan. The blow method is used in main tunnel and the mixed ventilation with lanewav-ventilation is employed in the side tunnel after the main sap is accomplished.
|
Received: 20 May 2002
|
|
|
|
|
Cite this article: |
YANG Heng-ping,GUO Xiao-song,ZHANG An, et al. STUDY OF VENTILATION SYSTEM DURING THE CONSTRUCTION WITH COMPLICATED TUNNEL AND GREAT VARIETY FACE DRILLING AND BLASTING METHOD[J]. Journal of Railway Engineering Society, 2002, 19(3): 93-95.
|
|
|
|
URL: |
http://tdgcxb.crec.cn/EN/ OR http://tdgcxb.crec.cn/EN/Y2002/V19/I3/93 |
[1]赖涤泉.隧道施工通风与除尘[M].北京:中国铁道出版 社.
[2]赖涤泉.秦岭隧道I线中部多工作面钻爆法施工通风系 统的研究与实践[J].世界隧道,2000,(4).
[3]崔颖哲.五指山隧道出口工区施工通风[R].
[4]唐经世.西康铁路秦岭隧道北段I线钻爆法段施工通风 [J].筑路机械与施工机械化.1999-04.
[5]隧道施工通风[J].隧道译丛,1990, (11):7-10.
|
|
|
|