Journal of Railway Engineering Society  2002, Vol. 19 Issue (2): 30-33    DOI:
Current Issue | Archive | Adv Search |
THE POSSIBLE TECHNICAL PROBLEMS AND COUNTERMEASURES DUR- ING CONSTRUCTION OF LAUNCHED BRIDGES
XU Hua-xuan
China Railway Sixteenth Engineering Bureau
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech