|
|
THE POSSIBLE TECHNICAL PROBLEMS AND COUNTERMEASURES DUR- ING CONSTRUCTION OF LAUNCHED BRIDGES |
XU Hua-xuan |
China Railway Sixteenth Engineering Bureau |
|
|
Abstract Based on the author's experiences on launched bridge at home and abroad,the possible technical problems and countermeasures are summarized during construction of launched bridges. The practices have proved that these measures are effective and useful.
|
Received: 08 March 2002
|
|
|
|
|
[1]赵志平. 桥梁顶推施工的精度探讨[J].桥梁建设.1994,(2 ).
[2] 范立础.预应力混凝上连续梁桥[M],人民交通出版社. 1997. |
|
|
|