|
|
CONSTRUCTION TECHNIQUE OF CASTING CONTINUOUS BEAMS IN SITU FOR HUTONG OVERPASS BRIDGE IN JIAXING CITY |
ZHANG Guo-hua,LIU Shu-ai,LV Tong-zhan |
China Railway Fourteenth Engineering Bureau Group Co. |
|
|
Abstract During construction of continuous beams for Hutong overpass bridge in Jiaxing City,the construction technique of setting up the full space support after foundation treatment at bridge sections with soft soil foundation,as well as adopting suspension formworks method with beam column support at bridge sections across the existing expressways,arc introduced in detail in this paper. They arc valuable as reference for the similar engineering projects.
|
Received: 12 January 2002
|
|
|
|
|
|
|
|