|
|
APPLYING TECHNIQUE OF CONTINUOUS ELASTIC FOUNDATION GROUND BEAM IN CONSTRUCTION OF TUNNEL |
QI Feng-wu, WANG Jian |
Eighteenth Railway Engineering Bureau of MOR |
|
|
Abstract By applying the technique of continuous elastic foundation ground beam, the problem concerned with the bearing capacity of foundation ground may be solved. Under the prerequisite to satisfy structural design, engineering quality and construction safety, unnecessary large area excavation may be reduced, accident occurred against construction safety and the waste of manpower and material resources may be avoided, so as to raise the working efficiency and to reduce the time limit for the project.
|
Received: 22 June 2001
|
|
|
|
|
|
|
|