Journal of Railway Engineering Society  2001, Vol. 18 Issue (3): 48-50    DOI:
Current Issue | Archive | Adv Search |
SCHEME OPTIMIZATION ON DESIGN OF 42M TIE BAR ARCH FOR HOUKOU EXTRA-LONGSPAN BRIDGE ON XI'AN-ANKANG RIALWAY AND ITS CONSTRUCTION
LIANG Xue-ming
First Survey and Design Institute of MOR
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech