ANALYSIS OF WORKING EFFICIENCY IN TUNNEL AND COSTRUCTION TECHNOLOGY OF FULL FACE TUNNEL BORING MACHINE |
GAO Xiao-dong, SHA Ming-yuan |
China Railroad Construction General Corporation |
|
|
Abstract The article introduces the construction situations of No.1 Tauhuapu Tunnel, the condition of geology, the main technical specifications of TB880E tunnel boring machine and the temporary supporting pans equipped for the rocks every factors which could influence the efficiency of working in broken zone in No.1 Tauhuapu Tunnel arc analyzed in detail. The article expounds also the improving production process, method of rock supporting process and the improving partial structure, disposition and adjusting construction technology of working control system in maintenance of boring machine and its notable effect in application.
|
Received: 20 March 2001
|
|
|
|
|
[1]Hester J C, Cighton U S, Curbs D J. Channel Tunnel UK TBM-France; The UK TBM drives[A]. In: Proceedings of 1991 Rapid Excavation and Tunneling Conference[C].1991.
[2]Dumont P. Channel Tunnel Project French worker[A]. In: Proceedings of 1991 Rapid Excavation and Tunneling Conference[C].1991.
[3]Shani Wallis. Soft ground TBMs set a cracking pace in caracas[J].Tunnels & Tunneling, Sept. 1988.
[4]Peter J. Tarkoy, John Wagner. Backing up a TBM[J]. Tunnels & Tunneling. Oct. 1988.
[5]王彬.敞开式掘进机在意大利阿尔卑斯山地区隧道中的应用[J].世界隧道(铁道部科学研究院西南分院),1996,(3).
|
|
|
|