PREVENTIVE MEASURES FOR FLOOD DEFECTS ON RAILWAY AT RESEROIR REGION IN FLOOD SEASON |
LIN Wen-teng |
Fuzhou Railway Branch Administration |
|
|
Abstract Due to the influence of power station reservoir in flood season the flood defects, such as the railway line submerged, the subgrade burst and the bridge fallen, occurred at Weiyang-Fuzhou Railway in which heavy losses were sustained. The causes of railway flood defects arc analyzed and researched comprehensively in this paper. Several preventive measures arc proposed, so as to eliminate the potential influence of power station reservoir on the railway safety.
|
Received: 10 February 2001
|
|
|
|
|