|
|
SCIENTIFIC FORECAST METHOD ON CONSTRUCTION RATE OF PROGRESS FOR TBM |
HE Yu-lian |
Research Institute of Sciences,Tunnel Engineering Bureau of MOR |
|
|
Abstract The paper makes a preliminary research on the telations between the tunneling speed of TBM and the geological conditions of tunnel .By utilizing statistical analysis method,a scientific fore- cast on construction rate of progress for TBM is put forward. The result of this exploration has been verified by practice in certain extent.
|
Received: 20 July 1998
|
|
|
|
|
|
|
|