|
|
NEW FORMULA OF CURVE STAKING-OUT OF FREE LOCATING STATION AND APPLICATED PROCEDURE |
CUI Ji-ying, ZHANG Liu-bin |
Fi f teenth Railw ay Engineering Bureau of MO R |
|
|
Abstract Acco rding to the new trait in mo derni zed center line survey of g et ting coo rdina tes f rom the Survey and Desig n Insti tute, the pa per choo ses out a mo re fi t coo rdinate system a nd deriv es out a g roup o f new fo rmula fo r arbi trary point in curv e in the sy stem. Hav ing one v ariable, it is not o nly simple fo r understanding , but also fi t fo r o riginal coo rdinate system. The calcula tion procedure o f layout of the engineering curv e may be mo re conv enient.
|
Received: 06 January 2000
|
|
|
|
|
[ 1] 邱国屏.铁路测量[M ].北京: 中国铁道出版社, 1996.
[ 2] 李青岳.工程测量学[M ].北京: 测绘出版社, 1988.
[ 3] 楼捍卫,贺晓华.任意点置镜测设曲线的方法及电算程序 [ J].铁道工程学报, 1997, ( 3).
[ 4] 徐万鹏,郑凤华.曲线测设通用公式及自由测站法测设曲线[ J].铁道工程学报, 1998, ( 2). |
|
|
|