DISCUSSION ON CALCULATION OF UNDERGROUND WATER IN TUNNEL ENGINEERING WORKS |
ZHOU Shu-ming |
Survey & Design Institute,Tunnel Engineering Bureau of Ministry of Railways |
|
|
Abstract In this paper, the treatment of underground water and the calculation of the load of underground water in tunnel engineering works are discussed when the water drainage can t be emploied under the restricted condition of environment protection or others.
|
Received: 01 February 2000
|
|
|
|
|