Abstract Due to the high difficulty in engineering works and big investment of the railway constructionin the mountain area,the demonstrations in different aspects should be put forward during setting up the construction projects. The route selection schemes should be economic and reasonable,and the main technical standards should be selected properly- During the research of the route selection schemes,the strip of land between hills should be determined reasonably,and the geological route selection should be taken into attention. Through carefully design,an economic and reasonable route may be selected so as to fulfill not only the requirements of railway transportation,but also to promote the development of the local economy.
|
Received: 25 October 1999
|
|
|
|
|
|
|
|