PRACTICAL EXPERIENCE OF FLOOD PROTECTION BY GROUTING FOR GUSHING WATER IN A COMMUNICATION CAVERN OF LPG ENGINEERING PROJECT AT SHANTOU CITY |
WANGRucheng HUANG Pingxian ZHENG Darong |
Tunnel Eng ineering Bureau o f MO R |
|
|
Abstract The communica tion cav ern o f LPG engineering pro ject in Shanto u City is a tunnel w ith the width 7. 2 m, heigh t 5. 7 m, cross-sectio n nea rly 40m2 and hav ing a dow n g radient of 13. 6% . Af ter blasting during the excav atio n o f tunnel reaching 245 m leng th at Februa ry 9 of 1998, the g ushing w ater occurred suddenly at the rig ht side o n the bot tom o f the tunnel. The capaci ty of g ushing w ater w as rather high , nearly 1500 m3 /d through the o bserv atio n and test. The paper int roduces mainly the w hole procedure of the f lood protection engineering t reatment by g routing in detail, a nd therefore, provides the ex perience as a reference fo r the simi lar engineering pro ject.
|
Received: 16 September 1998
|
|
|
|
1 杜嘉鸿等编著.地下建筑注浆工程简明手册[M ].科学出版社, 1992年11月
2 王梦恕主编.大瑶山隧道- 20世纪隧道修建新技术[M ].广东科技出版社, 1994年12月
3 崔玖江编.水下隧道浆堵水[M ].中国铁道出版社, 1978 |
|
|
|