STUDY ON ADVANCE GEOLOGICAL FORECAST IN TBM CONSTRUCTION OF NO. 1 TAOHUAPU TUNNEL |
YANG ZHi-guo |
Xi'an branch of The First Railways Survey and Design Institute |
|
|
Abstract The paper introduced characteristics and basic principles of Advance Geological forecase. Integrating practices of Taohuapu No. 1 Tunnel in Xian-Nanjing railway,the author compared the result of Advance Geological forecase and excavated tunnel,The results shows importance and good practicability in Advance Geological of tunnel.
|