DESIGN OF TWO FLANKS SPLICED JOINT FACTORY-MADE PARTIALLY PRESTRESSED CONCRETE BOX GIRDER |
Peng Xiaohua |
The Professional Design Institute of the Railway Ministry |
|
|
Abstract In this article,there is an introduction of the origin of the factory-made box girder of railroad and the method of deck plate expanded. Basing upon the process of design and test of the factory-made box girder as a development mode for high-speed and heavy-Ioad, there are some advantages and viewpoints of this box girder to be expounded.
|
Received: 18 April 1997
|
|
|
|
|
|
|