FULLY FILLED WITH GEOLOGIC HAZARDS IN NAN-KUN RAILWAY |
Lu Yulong Shuai Shiw en |
Seco nd Surv ey a nd Desig n Insti tute of MOR |
|
|
Abstract Nan-Kun railw ay w as fully fi lled wi th the geologic hazards, such as the fault zone, la ndslide, ex pansiv e rock, hig h pressure g as, high g eostress and so for th. All type of g eo logic hazards had a v ery w ide di stribution. There w ere serious ef fects on the cost , quali ty and time o f completion. The surv ey and const ructio n fo r the prev entiv e mea sures o f the g eolo gic ha zards a re analy zed in the pa per.
|
Received: 23 February 1997
|
|
|
|