Journal of Railway Engineering Society  1995, Vol. 12 Issue (2): 74-79    DOI:
Current Issue | Archive | Adv Search |
CONTROLLED BLASTING ADOPTED ON RECONSTRUCTING SECOND LINE OF BAOJI-CHENGDU RAILWAY
Xie Tiaiji
Construction Dept.,Second Railway Engineering Bureau of MOR,Chengdu 610032
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech