CONTROLLED BLASTING ADOPTED ON RECONSTRUCTING SECOND LINE OF BAOJI-CHENGDU RAILWAY |
Xie Tiaiji |
Construction Dept.,Second Railway Engineering Bureau of MOR,Chengdu 610032 |
|
|
Abstract Based on the engineering characteristics and the geological conditions of the Baoji- Chengdu double-track railway line,this paper gives the discussions on the engineering organi?zations and the technological processes of the controlled blasting. A set of working methods have been established for drilling holes, putting in explosives, plugging up and firing. The method for blasting an insolated big rock has been also proposed.
|
Received: 18 February 1995
|
|
|
|
|
|
|