|
|
A NEW SHALLOW-UNDER GROUND CUT METHOD FOR UR-BAN UNDERGROUND ENGINEERING |
Bai Xiaoren |
Tunnel Engineering Bureau of MOR |
|
|
Abstract This paper introduces the principles and technology of a new shallew-underground cut method originated by the Railway Tunnel Engineering Bureau during constructing the West Tian,anmen station of the Beijing Metro Lines. The new cut method is more economic > practical and reliable than the original design scheme. This new experience is also valuable for constructing other underground engineerings.
|
Received: 28 April 1995
|
|
|
|
|
|
|