Comparative Research on the Layout Mode of OCS Overhead 18# Turnout in High Speed Railway |
WANG Guo-Bang1, HAN Ling-Qing2 |
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300251,China |
|
|
Abstract Research purposes: There has many modes of 180 turnout type in the high speed railway. The research is done on comparative studies of the turnout type techniques in China for the purpose of providing technical support to high speed railway construction under the premise of meeting the needs of pantograph and catenaries coordinate.
Research conclusions: Under the crossing type,when the EMU through the main line in high speed,it will approach the side line. This situation will affects the capability of current collection between the pantograph and OCS due to the OCS crossing is a hard-point. Simple non-crossing type is easy to arrange and fix due to the system has no crossing between OCS of main line and side line. When the EMU through the main line in high speed,the pantograph can't contact the side line. But when the EMU come into main line from the side line,the pantograph angle squeezes into the main Line,while the side line and the main line are in the different sides of the pantograph center. In non-crossing with guiding centenary type, the guiding OCS is in between main line and side line,which contacts the pantograph all along in crossing center area, so as to the pantograph can transit from side line to main line or from main line to side line, and reduce the impulsion to main line OCS. There is no abnormal abrasion in guiding OCS. The type is adaptive to high speed,and has better capability of current collection between pantograph and centenary. The contact line is always in the area of the pantograph contact strip and there has no hard-point of the crossing.
|
Received: 18 December 2013
|
|
|
|
|
[1]于万聚.高速电气化铁路接触网[M].成都:西南交通大学出版社,2002.
Yu Wanju. Centenary System of High-speed Electrified Railway [ M].Chengdu: Southwest Jiaotong University Press,2002.
[2]德]基布岭,等.电气化铁道接触网[M].中铁电气化局集团有限公司译.北京:中国电力出版社,2003.
KieBings , etc. Contact Lines for Electric Railways [M].China Railway Electrification Bureau Group Co. Ltd. Translation. Beijing; China Electric Power Press, 2002.
[3]吉鹏霄.接触网[M]北京:化学工业出版社,2006.
Ji Pengxao. Overhead Contact Line System[M]. [4] Beijing;Chemical Industry Press ,2006.
[4]罗健,韩凌青,林德福.客运专线18#道岔接触网无交叉布置方式研究[J].铁道工程学报,2008(6);67-70.
Luo Jian , Han Lingqing , Lin Defu. Research on the Non -crossing Layout Mode of OCS in Turnout 18" Zone of Passenger Dedicated Line[J].Journal of Railway Engineering Society , 2008 ( 6) ; 67-70.
[5]刘永红.铁路客运专线接触网系统工程技术的研究 [D].成都:西南交通大学,2007.
Liu Yonghong. Research on OCS Engineering Techniques of Passenger Dedicated Line [ D ].Chengdu; Southwest Jiaotong University ,2007.
[6]徐鸿伟.客运专线道岔接触网布置关键技术研究[J].科技资讯,2013(21):111-112.
Xu Hongwei. Research on the Key Technology of Overhead Crossings of Passenger Dedicated Line[J]. Science & Technology Information, 2013(21):111- 112.
[7]刘永红.300-350 km/h高速铁路牵引供电系统集成主要技术方案的探讨[J].铁道标准设计,2009 ( 1) ; 91- 94.
Liu Yonghong. Exploration for Main Technical Scheme。 Integration of Traction Power Supply System for 300- 350 km/h High Speed Railway[J].Railway Standard Design,2009(1):91-94.
[8]李德胜.接触网系统对高速铁路行车安全的影响[J].中国铁路,2011(2);34-37.
Li I)meshing. Influence of Catenaries System to Running Safety of High Speed Railway [ J ].China Railway , 2011 (2) :34-37.
|
|
|
|