Abstract Research purposes: At present, the highway and railway constructions are booming. They both belong to transportation project, but they follow the different professional standards,so they have different working ways for the engineering geological invetisgation. In practice, it is easy to cause the confusion to make error. To discuss their geological investigation works is helpful for guiding the engineering investigation and exchanging the data.
Research conclusions: (1) In dividing the investigation stage,they are almost the same,but the highway engineering geological investigation focuses on the preliminary investigation and detailed investigation, while the railway geological investigation focuses on the preliminary investigation, location investigation and supplemental locational investigation. (2) The qualitative description is used for the surrounding rock classification of the railway tunnel along with the multiple indicator quantitative evaluation,while the quantitative evaluation-based multiple parameters method is used for the highway tunnel. Their results have a little gap. (3) There are gaps in discrimination of the unfavorable geological conditions and special rock soil,such as sand liquefaction and expansive soils. (4) There are gaps in soil classification, such as the classifications of the boundaries gravel soil particle size, the clayey soil plasticity state and the soft soil. (5) There are big gaps in evaluation of the water and soil corrosions.
|
Received: 10 May 2010
|
|
|
|
|
[1] JTG C20-2011,公路工程地质勘察规范[S]. JTG C20-2011,Code for Highway Engineering Geological Investigation [S].
[2] TB 10012-2007,铁路工程地质勘察规范[S]. TB 10012-2007,Code for Geology Investigation of Railway Engineering [S].
[3] TB 10077-2001,铁路工程岩土分类标准[S]. TB 10077-2001,Code for Rock and Soil Classification of Railway Engineering [S].
[4] GB 50111-2006,铁路工程抗震设计规范(2009年版)[S]. GB 50111-2006,Code for Seismic Design of Railway Engineering(2009 Edition) [S].
[5] TB 10005-2010,铁路混凝土结构耐久性设计规范[S]. TB 10005-2010,Code for Durability Design on Concrete Structure of Railway [S].
[6] GB 50218-94,工程岩体分级标准[S]. GB 50218-94,Standard for Engineering Classification of Rock Masses [S].
[7] 郭呈葵,熊友山,姚海林,等.模糊数学在当宜高速公路膨胀土判别和分类中的应用[J], 岩土力学,1999(9): 61-65. Guo Yukui , Xiong Youshan , Yao Hailin , etc. Application of Fuzzy Mathematics in Classification of Expansive Soils for Expressway from Dangyang to Yichang [J]. Rock and Soil Mechanics, 1999(9): 61-65.
[8」赵华宏,彭海红.隧道勘察围岩级别划分研究[J].交通标准化,2008(4): 152-154. Zhao Huahong, Peng Haihong. Study on Surrounding Rock Mass Classification in Mountain Tunnel Geotechnical Investigation [J]. Communicationgs Standardization, 2008(4): 152-154.
[9] 王子江,吴芳若,李蓉仑.《铁路工程水质分析规程》侵蚀性分析应注意的问题[J].铁道工程学报,2009(8): 6-9. Wang Zijiang, Wu Fangrno, Li Ronglun. Issues on Analysis of Corrosion of Water Quality with "Code for Analysis of Water Quality in Railway Engdeerng" [J]. Journal of Railway Engineering Society, 2009(8): 6-9.
[10] 杨勃.中德铁路工程线路技术标准对比分析[J].铁道工程学报,2010(2): 37-40. Yang Bo. Comparison and Analysis of the Technical Standards for Railway Track between China and Germany [J].Journal of Railway Engineering Society,2010(2): 37-40.
|
|
|
|