Abstract Research purposes: In recent years,the horizontal rotation method is adopted in construction of railway passenger dedicated line when the continuous beam bridge crosses the existing railway. Some of the continuous beams have the characteristics of large span,heavy weight of rotating body and small radius of plane curve. So,it is necessary to calculate and analyze the key parts of the rotational structure and key links of construction and study the influence of plane curve on design of the rotational structure for solving the problems in design of the ball-joint turn table and its construction technology.
Research conclusions: (1) To determine the reasonable sizes of the turn table and ball joint and analyze the local stress of the special position of the turn table are crucial to design of the rotatianal structure when the weight of the rotating body is heavy. (2) To calculate the unbalanced rotating torque and set the rotating eccentric are the ways to overcome the influence of the plane curve. (3) The theoretical calculation results of the unbalanced rotating torque, rotating eccentric,eccentric and friction coefficient can be verified by doing the weighing test and counter weight test.
|
Received: 12 October 2012
|
|
|
|
|
[1] TB 10002.5—2005, 铁路桥涵地基和基础设计规范[S]. TB 10002.5—2005,Code for Design on Subsoil and Foundation of Railway Bridge and Culvert [S].
[2] TB 10002.3—2005,铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S]. TB 10002.3—2005,Code for Design on Reinforced Concrete and Prestressed Concrete Structure of Railway Bridge and Culvert [S].
[3] TB 10621—2009, 高速铁路设计规范(试行)[S]. TB 10621—2009,Code for Design of High Speed Railway (Trial) [S].
[4] 张联燕,程懋方,等. 桥梁转体施工[M]. 北京:人民交通出版社, 2001. Zhang Lianyan, Cheng Maofang. Bridges Rotation Construction [M]. Beijing: China Communications Press, 2001.
[5] 金成棣. 预应力混凝土梁拱组合桥梁[M]. 北京:人民交通出版社, 2000. Jin Chengdi. Prestressed Concrete Girder and Arch Combination Bridge [M]. Beijing: China Communications Press, 2000.
[6] TB 10002.1—2005,铁路桥涵设计基本规范[S]. TB 10002.1—2005, Fundamental Code for Design on Railway Bridge and Culvert [S].
[7] TB-10002.4—2005, 铁路桥涵混凝土和砌体结构设计规范[S]. TB-10002.4—2005, Code for Design on Concrete and Block Masonry Structure of Railway Bridge and Culvert [S].
[8] TB 10002.2—2005, 铁路桥梁钢结构设计规范[S]. TB 10002.2—2005, Code for Design on Steel Structure of Railway Bridge [S].
[9] 铁建设 [2010] 241号,高速铁路桥涵工程施工技术指南[S]. Railway Construction [2010] No.241, High-speed Railway Bridge and Culvert Construction Technical Guide [S].
[10] TZ 324—2010, 铁路预应力混凝土连续梁(刚构)悬臂浇筑施工技术指南[S]. TZ 324—2010, Railway Prestressed Concrete Continuous Beam (Rigid Frame) Cantilever Cast Technical Guide [S].
[11] 王立中. 转体施工的公路T型刚构桥梁转动结构设计[J]. 铁道工程学报, 2006(9): 41-43. Wang Lizhong. Design of the Rotational Struction of Highway T-shape Rigid Frame Brige Constructed with the Method of Slewing [J]. Journal of Railway Engineering Society, 2006(9): 41-43.
|
|
|
|