Research on Program for Leading Line 8 of Wuhan Metro into OCT |
ZHANG Jia-jun |
China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan,Hubei 430063 ,China |
|
|
Abstract Research purposes: The city development can attract a big passenger flow for metro traffic,enhance the subway value and achieve the virtuous circle of the subway and urban developments. According to the requirements of the "Construction Plan of Wuhan City Rapid Transit",the Line 8 of Wuhan metro is required to be led into the OCT. The construction here becomes the braking point of the main direction of the Line 8 construction because the OCT is close to the East Lake Scenic Area and it is difficult to coordinate the Line 8 with the OCT. In addition, the metro line will be cycled in the East Lake Scenic Area and it will increase the construction scale and have the big impact on the the East Lake Scenic Area.
Research conclusions: Based on the investigation of the current conditions and the analysis of the reasons for the difficulties, the difficult problems in coordination of the Line 8 with the OTC is overcome by taking the countermeasures, getting the good results. (1) Compared with the construction planning,the track length is shortened and the project investment is saved by 2.1 billion yuan. (2) By reasonably setting up the stations, the OCT branch lines and the Line 4 can cover the surrounding areas, and it can promote the rapid development of the region. (3) The floor of the property development increases by 29,150 square meters and the commercial value of the subway is enhanced.
|
Received: 14 May 2012
|
|
|
|
|
[1] GB 50157—2003,地铁设计规范[S]. GB 50157—2003,Code for Design of Metro [S].
[2] GB 50091—2006,铁路车站及枢纽设计规范[S]. GB 50091—2006,Code for Design of Railway Station and Terminal [S].
[3] GB 50090—2006,铁路线路设计规范[S]. GB 50090—2006, Code for Design of Railway Line [S].
[4] 中铁第四勘察设计院集团有限公司.武汉市轨道交通8号线工程总体设计[Z].武汉:中铁第四勘察设计院集团有限公司,2012. China Railway Siyuan Survey and Design Group Co. Ltd. Overall Design for Rail Transit Line 8 in Wuhan [Z]. Wuhan: China Railway Siyuan Survey and Design Group Co. Ltd,2012.
[5] 高华.轨道交通车辆段出人线接轨方案设计探索[J].铁道工程学报,2012(6): 114-117. Gao Hua. Ail Depot Access Line Integration Program Designed to Explore[J]. Journal of Railway Engineering Society, 2012(6): 114-117.
|
|
|
|