A Technical Solution Study of Turnout Inserting into Ballastless Track of Existing High - speed Railway |
SUN Li |
(China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan,Hubei 430063,China) |
|
|
Abstract Abstract :Research purposes : With the development of high - speed railway in China, the high - speed railway construction planning is renewing,which makes it necessary to insert turnouts into ballastless track of exsisting high - speed railway. On one side,it needs to ensure the operation of railway; on the other side,the track needs to be removed to insert turnouts. The way to solve the inconsistence is the key technical problem faced by high - speed railway develNpment. Research conclusions :( 1 ) Three technological schemes are proposed, including composite sleeper A polyurethane curing ballast bed,long sleeper buried ballastless track,and composite sleeper A ballastless track bed,which are all meet the relevant technical requirements of inserting turnouts into ballastless track of high - speed railway in operation. (2) It is recommended to use the composite sleeper A ballastless track bed scheme while inserting turnouts into baiastless track of high - speed railway which have been put in operation. (3) Through the practice experience in the newly - built Zhangiajie - Jis!iou - Huai!iua railway connecting to the existing Shanghai - Kunming high - speed railway,it has been proved that tiie research achievement can be applied in the track structure design of high - speed railway.
|
Received: 09 September 2016
|
|
|
|
|
|
|