Journal of Railway Engineering Society  2017, Vol. 34 Issue (5): 11-14    DOI:
Geology and Subgrade Current Issue | Archive | Adv Search |
Research on the Long - term Monitoring Technology of Subgrade Settlement for High - speed Railway in Operation Period
WANG Xiang,WANG Bo, WANG Zheng -xing
(China Railway Bridge Science Research Institute Ltd,Wuhan,Hubei 430034,China)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech