Abstract Research purposes :The price margin coefficient of material is an important parameter for compiling the budget of railway engineering. However, it is difficult to control the project investment because the issuing time of the price margin coefficient often lags behind and the material price often fluctuates due to the market influence. In this paper, a new model is presented for forecasting the expected value of the price margin coefficient of the railway engineering for the purpose of effective control of the project investment.
Research conclusions :(1) With the combination forecasting methods, the regression model for the price margin coefficient is built by using the curve fitting method and modified by using the residual series ARMA model and then the regression ARMA combination forecasting model is built to forecast the expected value of the price margin coefficient of railway project for effective control of the project investment. (2) The combination fitting model has good fittingness. By using this model, the material price margin coefficients from 2009 to 2011 were checked and the forecasting values were well fitting with the actual values. (3) The combination forecasting model presented in this paper is available for the investment estimate of the planned project, the investment evaluations of the medium and long term projects, the cost control of the undergoing project and the bidding price of contracting project.
|
Received: 28 January 2013
|
|
|
|
|
[1]王振龙.时间序列分析[M].北京:中国统计出版社,2000.
Wang Zhenlong. Time Series Analysis [ M ] ? Beijing : China Statistics Press, 2000.
[2]李晶晶,张飞涟.运用转移函数模型预测铁路建设项目运 营有关成本[J].铁路运输与经济,2007 (1):7-9.
Li Jingjing, Zhang Feilian. Forecast the Operation Cost of Railway Construction Projects by Using the Fransfer Function Model [J], Railway Transport and Economy, 2007(1):7-9.
[3]铁道部.关于发布铁路工程建设材料价差系数的通知 [J].铁路工程造价管理,2009 -2012.
The Ministry of Railways of the People’s Republic of China. Announcement about the Railway Engineering Construction Material Price Difference Coefficient [J]. Railway Engineering Cost Management,2009 - 2012.
[4 ] SPSS Inc. IBM SPSS Statistics 19 Corn System user’s Guid [ M ] .Chicago :Prentice Hall ,2010.
[5] GEP Box, GM Jenkins, GC Reinsel. Time Series Analysis : Forecasting and Control [ M ] . John Wiley & Sons, Inc. Publication,2011.
|
|
|
|