Research on the Overall Reconstruction Scheme of Rail Transit in Operation Based on Professional Synergism |
DAI Zhiren1, WANG Zeyu2, WANG Jun1, JI Ruiqi1, ZHOU Hongchang1 |
1. China Railway First Survey and Design Institute Group Co. Ltd, Xi'an, Shaanxi 710043, China; 2. Jiangsu Ocean University, Lianyungang, Jiangsu 222005, China |
|
|
Abstract Research purposes: As for the reconstruction of operated rail lines caused by its connection with large railway hubs, the reduction of the interruption time of rail operation is the most important factor should be considered. Considering the reconstruction difficulty, the method that can not only meet the railway operation requirements, but also can reduce reconstruction period and reconstruction difficulty, is put forward. Research conclusions: (1) The overall reconstruction method for elevated rail line based on the minimum influence range and the shortest outage time, which can realize the operation of main line and branch line, is put forward. (2) As for elevated station, escalators will be dismantled in stages, the reserved groove in broadened middle plate is adopted in the connection with pedestrian bridge. And the adjacent reconstruction method for elevated station in stages without interrupting metro operation can be formed. (3) As for elevated railway interval, based on the basic principle of parallel operation and effective connection of successive process, the casting technology of elevated bridge with lateral position and lateral translation is put forward. And then, the least interruption time for rail transit operation can be realized. (4) As for the post-station engineering, based on the principle of professional synergism and crossed construction, the controlling process of track laying and catenary transformation is found, and the catenary transformation time can include the time of reconstruction of ring cable, water supply and drainage, communication transformation, and signal installation and debugging. (5) The research results can lead a reference for similar project in future.
|
Received: 18 March 2022
|
|
|
|
|
[1] |
王益群. 上海轨道交通莲花路站开发建设可行性研究[J].地下工程与隧道,2012(2):19-21.Wang Yiqun. Feasibility Study on Development and Construction of Lianhua Road Station of Shanghai Rail Transit[J].Underground Engineering and Tunnel,2012(2):19-21.
|
[2] |
薛婷婷. 某新建地铁车站与既有车站换乘节点改造方案研究[J].建筑科技,2021(3):21-23.Xue Tingting. Transfer Connection Planning for New Subway Station and Existing One[J].Building Technology,2021(3):21-23.
|
[3] |
高鹏. 三线换乘站客流集散服务水平评价研究[D].成都:西南交通大学,2020.Gao Peng. Research on Evaluation of Passenger Flow Distribution Serve Level of Three-line Transfer Station[D].Chengdu: Southwest Jiaotong University, 2020.
|
[4] |
重庆城市交通开发投资(集团)有限公司. 重庆市城市轨道交通第四期建设规划(2020—2025年)[R]. 重庆: 重庆城市交通开发投资(集团)有限公司,2020.Chongqing City Transportation Development & Investment Group Co. Ltd. The Fourth Construction Plan of Chongqing Urban Rail Transit(2020—2025)[R]. Chongqing:Chongqing City Transportation Development & Investment Group Co. Ltd,2020.
|
[5] |
中铁第一勘察设计院集团有限公司. 重庆轨道交通6号线运营组织及刘家坪站接轨方案专题研究[R]. 重庆:中铁第一勘察设计院集团有限公司,2021:10-30.China Railway First Survey and Design Institute Group Co. Ltd. Study on the Operation Organization and the Connection Scheme of Liujiaping Station of Chongqing Rail Transit Line 6[R]. Chongqing:China Railway First Survey and Design Institute Group Co. Ltd, 2021:10-30.
|
[6] |
中铁第一勘察设计院集团有限公司. 重庆轨道交通6号线二期工程初步设计[R].重庆:中铁第一勘察设计院集团有限公司,2012.China Railway First Survey and Design Institute Group Co. Ltd. Preliminary Design of the Second Phase of Chongqing Rail Transit Line 6[R].Chongqing: China Railway First Survey and Design Institute Group Co. Ltd, 2012.
|
[7] |
贺亚林,赵煜成,田启军. 桥梁现浇支架整体平移施工关键技术研究[J].中外公路,2017(3):157-160.He Yalin, Zhao Yucheng, Tian Qijun. Research on Key Technology of Integral Translation Construction of Cast-in-place Bridge Support[J]. Journal of China and Foreign Highway,2017(3):157-160.
|
[8] |
孟亚东,贾崇强,韩宝明,等.城市轨道交通运营安全评价的现状与展望[J]. 都市快轨交通,2014(4):17-24.Meng Yadong, Jia Chongqiang, Han Baoming, etc. Present Situation and Prospect of Research on Safety Evaluation of Urban Rail Transit Operation[J]. Urban Rapid Rail Transit, 2014(4):17-24.
|
|
|
|