Research on the Design Parameters of Long-span Railway Concrete Extradosed Bridge |
SUN Zonglei1, ZHOU Yuewu2 |
1. China Railway Economic and Planning Research Institute, Beijing 100844, China; 2. China Railway Design Corporation, Tianjin 300308, China |
|
|
Abstract Research purposes: With the rapid development of my country′s railways, especially high-speed railways, long-span railway concrete extradosed bridges have become more widely used. For example, the Yingshang Bridge on Shangqiu-Hefei-Hangzhou Railway with a main span of 220 meters, the Apengjiang Bridge on Qianjiang-Zhangjiajie-Changde Railway with a main span of 240 meters, and the Wulongjiang River Bridge on Fuzhou-Pingtan Railway with a main span of 288 meters. Through the research on the design parameters of long-span extradosed bridges at home and abroad, and combined with the impact of key design parameters on mechanical properties, the reasonable values of key design parameters are proposed. Research conclusions: (1) Appropriate structural systems for long-span railway concrete extradosed bridge should be selected according to local conditions to reduce structural deformation, maintenance and repair, and improve driving comfort; (2) The height-to-span ratio of pylon above the bridge deck and main girder for railway extradosed bridge should be 1/8~1/10; (3) The fulcrum depth-to-span ratio of main girder for the railway extradosed bridge should be 1/18~1/20, and the ratio of the mid-span beam height to the fulcrum beam height should be 0.45~0.6; (4)The stay cable safety factor of the railway extradosed bridge is recommended to be no less than 2.0; (5)The research conclusions can provide references for the design of railway bridges.
|
Received: 22 February 2021
|
|
|
|
|
[1] |
Konstantinos Kris Mermigas. Behaviour and Design of Extradosed Bridges[D].Toronto: University of Toronto, 2008.
|
[2] |
Takanori NAGAI, Takahiko NISHI, Masashi ABE,etc. 4-Span PC Extradosed Bridge Intersecting the River at 30 Degrees——Kyushu Shinkansen Onogawa Bridge[J].2014.
|
[3] |
Shinichi Tamai,Kenji Shimizu. Thelong Spanned Bridge for Deflection-restricted High Speed Rail-Sannai-Maruyama Bridge[C]//9th World Congress on Railway Research,Lille,2011.
|
[4] |
张雷.三塔四跨铁路矮塔斜拉桥设计[J].高速铁路技术,2010(12):134-139.Zhang Lei.Design for Low Tower Cable-stayed Bridge with 3 Towers and 4 Spans[J]. High Speed Railway Technology, 2010(12):134-139.
|
[5] |
周岳武.商合杭高铁矮塔斜拉桥设计与关键技术[J].中国铁路,2020(6):71-76.Zhou Yuewu. Design and Key Technology of Extradosed Cable-stayed Bridge on Shangqiu-Hefei-Hangzhou High Speed Railway[J].China Railway, 2020(6): 71-76.
|
[6] |
宋子威,杨利卫,王德志.福平铁路乌龙江(144+288+144)m部分斜拉桥主桥设计[J].铁道标准设计,2017(11):42-46.Song Ziwei, Yang Liwei, Wang Dezhi. The Design of Main Bridge of Wulong River on Fuzhou-Pingtan Railway[J].Railway Standard Design, 2017(11):42-46.
|
[7] |
施文杰. 矮塔斜拉桥在国内外的发展与实践[J]. 现代交通技术,2012(3):22-25.Shi Wenjie. Development and Practice of Extradosed Bridge at Home and Abroad[J]. Modern Transportation Technology, 2012(3):22-25.
|
[8] |
S Lkeda,A Kasuga. Development of Extradosed Structures in the Bridge Construction[C]//25th Conference on Our World in Concrete & Structures.Singapore,2000.
|
|
|
|