Analysis of Formation Cause and Movement Characteristics of Mud - stone Flow in Mengshuiling of Hainan Province |
FU Kai - long,PENG Jin - wei,FENG Tao |
China Railway Eryuan Engineering Group Co. Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes:A large mud - stone flow suddenly happened in the Qingshuiwan section of Hainan east ring railway to be open for traffic soon and the eastern speedway. The mud - stone flow flowed over the railway embankment and passed through the space under the bridge and then flowed over the speedway surface into the South China Sea. By observing the forming process of mud - stone flow and using the various means,such as geologic survey,aerial photography,exploration and field test,the analysis of the formation cause for giant landslide,the mechanism of turning landslide into mud - stone flow and the runoffing and accumulating characteristics of the mud - stone flow was made.
Research conclusions: (1) The appearance of the giant landslide in fluidity area reflected the features of the suddenness and the high - level and high - speed movement of gaint mud - stone flow.(2) The broken weathered granite rock mass and the unfavorable structural plane were the basic condition for landslide. (3) The effects of the heavy rainfall,loading and water softening along the steep under structural plane were the direct cause for the landslide.(4) After the landslide was rapidly gliding,the landslide disintegrated quickly and turned into mud - stone flow with water.Then the mud - stone flow constantly scoured the ditch bed to cause increasement of the water content gradually and quickly moved for about 4 kilometers.(5) The Qingshuiwan section of Hainan east ring railway and the eastern speedhway were located in the outside edge of the accumulating area of the mud - stone flow.When the mud - stone flow arrived at this place,its intensity was much weakened with less destroy degree.
|
Received: 28 July 2012
|
|
|
|
|
[1]许强,董秀军,邓茂林,等. 2010 年 7·27 四川汉源二蛮山滑坡 -碎屑流特征与成因机理研究[J].工程地质学报,2010( 5) :609 -622.
Xu Qiang,Dong Xiujun,Deng Maolin,etc.The Ermanshan Rock Slide - Debris Flow of July 27,2010 in Hanyuan,Sichuan: Characterestics and Failure Mechanism[J].Journal of Engineering Geology,2010(5) : 609 -622.
[2]陈晓清,李泳,崔鹏.滑坡转化泥石流启动研究现状[J].山地学报,2004( 5) :562 -567.
Chen Xiaoqing,Li Yong,Cui Peng. An Overview of Transformation of Landslide into Debris Flow[J].Journal of Mountain Science,2004( 5) : 562 - 567.
[3]谢守益,徐卫亚. 降雨诱发滑坡机制研究[J]. 武汉水利电力大学学报,1999( 3) :21 -23.
Xie Shouyi,Xu Weiya. Mechanism of Landslides Induced by Precipitation[J].Engineering Journal of Wuhan University,1999( 3) : 21 - 23.
[4] 张明,胡瑞林,殷跃平,等. 滑坡型泥石流转化机 制环剪试验研究[J]. 岩石力学与工程学报,2010( 4) :822 -832.
Zhang Ming,Hu Ruilin,Yin Yueping,etc. Study of Transform Mechanizm of Landslide - debris Flow With Ring Shear Test[J]. Chinese Journal of Rock Mechanics and Engineering,2010( 4) : 822 - 832.
[5]姚勇,高加成,姚文花. 临潼大水沟泥石流特征分析及危险性评价[J].铁道工程学报,2010( 11) :5-9.
Yao Yong,Gao Jiacheng,Yao Wenhua.Features Analysis and Hazard Assessment of Dashuigou Debris Flow in Lintong[J].Journal of Railway Engineering Society,2010( 11) : 5 - 9.
|
|
|
|