Research on the Protection Configuration of Traction Substation in Bilateral Interconnected Power Supply Mode |
WANG Jilai |
(China Railway First Survey and Design Institute Group Co. Ltd, Xi′an, Shaanxi 710043, China |
|
|
Abstract Research purposes: In order to solve the problems of train deceleration, power loss, overvoltage and power supply reliability caused by the phase splits of electrified railways, especially mountainous electrified railways, a bilateral interconnected power supply system was proposed, so that two adjacent traction substations can be connected to each other. Through connection between the groups, the in-phase power supply of the catenary within the group range was realized, which provided conditions for canceling the phase splits. However, there were significant differences between the protection configuration scheme of traction substations under the bilateral interconnected power supply mode and the unilateral power supply mode, which had an important impact on the main wiring form and operation mode of the traction substation and the reliability of the traction power supply system. In this paper, relied on the bilateral interconnected power supply test project, by 110 kV traction substation as an example, from the structural characteristics of the bilateral interconnected power supply system, the protection configuration scheme of the traction substation was studied. Research conclusions: (1) In the bilateral interconnected power supply mode, the longitudinal protection was used on the feeder of the traction substation. (2) In the bilateral interconnected power supply mode, an independent 27.5 kV bus differential protection was used in the traction substation. (3) In the bilateral interconnected power supply mode, the incoming line of the traction substation should be combined with the local substation to set up the incoming line optical fiber differential protection. (4) The research conclusions can provide a theoretical basis for the engineering application of bilateral interconnected power supply technology.
|
Received: 08 December 2021
|
|
|
|
|
[1] |
曹建猷. 电气化铁道供电系统[M]. 北京: 中国铁道出版社, 1983.Cao Jianyou. Electrified Railway Power Supply System[M]. Beijing: China Railway Publishing House, 1983.
|
[2] |
李群湛, 贺建闽. 牵引供电系统分析[M]. 成都: 西南交通大学出版社, 2007.Li Qunzhan, He Jianmin. Analysis of Traction Power Supply System[M]. Chengdu: Southwest Jiaotong University Press, 2007.
|
[3] |
李群湛,王辉,黄文勋,等. 电气化铁路牵引变电所群贯通供电系统及其关键技术[J]. 电工技术学报,2021(5):1064-1074.Li Qunzhan, Wang Hui, Huang Wenxun,etc. Interconnected Power Supply System of Traction Substation Group and Its Key Technologies for the Electrified Railway[J].Transactions of China Electrotechnical Society, 2021(5):1064-1074.
|
[4] |
范红静. 电气化铁路双边供电系统性能分析[D].成都:西南交通大学,2015.Fan Hongjing. Performance Analysis of Bilateral Power Supply System in Eelectric Railway[D]. Chengdu:Southwest Jiaotong University, 2015.
|
[5] |
李冬. 电气化铁路双边供电对电力系统的影响分析[D].成都:西南交通大学,2011.Li Dong. The Impact of Bilateral AC Electrified Railway on Power System[D]. Chengdu:Southwest Jiaotong University, 2011.
|
[6] |
余涵. 电气化铁路双边供电及其对电力系统的影响与对策研究[D].成都:西南交通大学,2017.Yu Han. Bilateral Power Supply in Electrified Railway and Its Influence and Countermeasure Analysis to Power System[D]. Chengdu:Southwest Jiaotong University, 2017.
|
[7] |
李波. 高速铁路双边供电继电保护方案研究[D].成都:西南交通大学,2011.Li Bo. Study on Protective Schemes of Bilateral Traction Power Supply System for High Speed Railways[D]. Chengdu:Southwest Jiaotong University, 2011.
|
[8] |
王芳. 川藏铁路双边供电可行性研究[D]. 北京:北京交通大学,2020.Wang Fang. Feasibility Study on Double Side Power Supply of Sichuan-Tibet Railway[D].Beijing:Beijing Jiaotong University, 2020.
|
|
|
|